Heavy Duty Logistics Transport Cart Metal Warehouse Base Plate Dolly

Customization: Available
Color: Customizable
Foldability: Non-Foldable

Product Description

Product Overview

Model NO.
TCP1051
Load Capacity
200 kg
Material
Metal
Platform Size
L610*W410mm
Usage
Construction, Garden, Home, Industrial, Warehouse
Wheel Type
Braked, Fixed, Polyurethane, Swivel
HS Code
8716800000
Capacity
50000 pieces/Year

Detailed Photos

Transport Cart Detail 1
Transport Cart Detail 2
Transport Cart Detail 3
Transport Cart Detail 4
Transport Cart Detail 5
Transport Cart Detail 6

Product Parameters

Model TCP1051
Material Heavy Duty Steel
Size L610*W410mm
Standard Feature Store and transport items effectively
Quality Control Full QC system with production process recording

Manufacturing Capacity

With more than 10 years of experience in material handling and storage equipment manufacturing, we specialize in roll containers, trolleys, storage cages, stack racks, and other metal fabrications made of steel, stainless steel, and aluminum. Our facilities include ERW tube lines, robotic welders, laser cutting, and professional coating lines (zinc plating, powder coating, and hot-dip galvanizing). All products meet international standards including CE and SGS certifications.

Factory Overview
Production Line
Welding Process
Equipment 1
Equipment 2
Equipment 3

Frequently Asked Questions

What are the available Trade Terms?
We offer Ex-work factory, FOB, and CIF terms depending on your requirements.
How long is the typical production lead time?
Normally 20-25 days after deposit during standard seasons, and 30-35 days during peak periods.
Can these products be customized?
Yes, we provide full customization services. Our technical team can produce detailed drawings based on your specific needs.
What materials are used for the casters?
Commonly used materials include TPR, PU, Nylon, and Rubber, depending on the application environment.
What surface treatments do you offer?
We provide Galvanized, Hot-Dip Galvanizing, and Powder Coating finishes to ensure durability and corrosion resistance.
What is the standard payment term?
T/T: 30% deposit to initiate production, with the balance due before shipment when goods are ready.

Related Products