High Quality Steel Stillage with Wheels Roll Container Warehouse Heavy Duty

Still deciding? Get samples of $ !
Request Sample

Product Description

📋

Basic Specifications

Model NO. FPRC series
Product Name Roll Cage / Roll Container / Rolling Stillage
Load Capacity 500kg-2000kg (Customizable)
Material Q235 High-Quality Carbon Steel
Shelf Type Plastic, Solid, Wire Mesh, Wooden, or Customized
Surface Treatment Galvanized / Electro-Galvanized / Powder Coated
Structure Type Foldable / Non-Foldable / Nestable
Sides 2-Sided / 3-Sided / 4-Sided
Wheel Type 4 Castor Wheels (2 Fixed + 2 Swivel) / PU / Rubber / Nylon
Usage Industrial Facility, Retail Store, Warehouse, Logistics, Cold Chain
Lead Time 15–30 Days After Deposit
Production Capacity 50000 Piece/Pieces Per Month
🔍

Product Description

Roll Cage Trolley
Steel Stillage
Warehouse Roll Container
Heavy Duty Roll Cage
Roll Container Details
Steel Storage Solution
Logistics Trolley
Warehouse Equipment
Industrial Roll Cage
Heavy Duty Stillage
Roll Cage Manufacturing
Transport Logistics
Folding Roll Cage

Frequently Asked Questions

1. What materials are used for the roll cage products?
We use high-quality mild steel Q235 and Q195 to ensure durability and strength for industrial use.
2. What kind of surface finishes do you provide?
We offer three main types of finishes: Electro-galvanized (Zinc plated), Hot-dip galvanized, and Powder coating in various colors.
3. What is the typical load capacity of these containers?
We provide models for different needs: Light duty (100-300kg), Medium duty (400-800kg), and Heavy duty (1000-1700kg). Custom capacities are also available.
4. Can these products be used in cold storage environments?
Yes, our roll cages, mobile racks, and wire containers are all widely used and suitable for cold storage facilities.
5. Do you offer R&D and design support for custom products?
Yes, our professional team provides assistance with design and production based on specific requirements, even if you don't have a drawing available.
6. What is the average production lead time?
The average lead time is typically 3-4 weeks once a formal order and deposit are received.

Related Products